- Home page
- All Ads
- Ads
- Communication
- About Us
Our villa project is located in the Alsancak region, 1.3 km from the sea and 600 m from the main road.
The nearest beaches are Maghe Monte and DenizKızı.
Construction start - October 2023
Completion - October 2025
Payment plan
- £5000 deposit
- 30% down payment
- remaining amount in 24 monthly instalments
The complex will consist of 10 detached villas with 4+1, 4 bathrooms.
1 floor - kitchen-living room, 1 bathroom.
2 floor - 4 bedrooms, 3 bathrooms.
Garage, private pool and garden
Total area from 380m2 to 617m2
Prices: 630 000- 890 000 GBP
STRUCTURAL SYSTEM
- Reinforced concrete structure.
- Exterior walls will be 25 cm thick brick. Interior walls will be brick. Roof will be waterproofed.
- WEBER waterproofing will be used.
- Silicone based paint will be used on exterior walls.
EXTERIOR CARPENTRY CLADDINGS:
- Aluminium double glazed windows will be used on balconies.
STAIRS:
- All stair treads will be natural wood.
INTERIOR WALLS:
- Plastic satin paint over gypsum plaster will be used on all interior walls.
CEILINGS:
- Plastic paint over gypsum plaster will be used on all ceilings.
- Plasterboard suspended ceiling with LED lighting.
STAIRCASE AND BALCONY RAILINGS:
- Glass railings will be used on balconies and stairs.
LIVING ROOM:
- Floor coverings are 60x120 ceramic tiles.
- All walls and ceilings will be painted with plastic satin paint over gypsum plaster.
- Ceramic tiles will be used as skirting.
KITCHEN:
- Flooring will be ceramic tiles.
- All walls and ceilings will be painted with plastic satin paint over gypsum plaster.
- Ceramic tiles will be used as skirting.
- Kitchen cabinets will be made of MDF laminate.
- Granite marble worktop.
- Stainless steel sink.
BEDROOMS:
- Floor coverings are 60x120cm ceramic tiles.
- All walls and ceilings will be painted with plastic satin paint over gypsum plaster.
BATHROOMS AND TOILETS:
- TSE certified ceramics will be used on walls and floors.
- Plastic paint over gypsum plaster will be used for the ceiling.
- Shower trays and shower cabins will be placed in accordance with the architectural design.
- High quality toilet bowls and washbasins with built-in reservoirs will be TSE certified.
- High quality TSE certified bathroom faucets and shower sets.
OPEN TERRACES AND BALCONIES:
- Ceramic tiles.
- Aluminium railings will be used on balconies.
DOORS:
- Reinforced steel door will be used as apartment entrance door.
- Interior doors will be American press doors.
- Door handles and locks will be TSE certified.
OVERVIEW:
- All bedrooms will have fitted wardrobes.
- Television and telephone installations will be provided in all rooms.
- Meter cabinets will be placed close to the main entrance of the building.
- Top soil for garden
- Walking paths
- Intercom connection
- Car park for 2 cars.
- CCTV camera system (pipework only)
- VRF system
- Electric underfloor heating.
- Swimming pool
PLUMBING AND ELECTRICAL INSTALLATIONS:
- All materials to be used in water and electrical installations must be TSE approved and of high quality.
- Inverter water pump or hydrofoil.
- Hot water tank - 100 litres.
- Hot water tank (boiler room)
- Fresh underground water tank - 10 tonnes capacity.
- An electric car charging box will be installed in the covered car area.
MATERIALS AND WARRANTY:
All materials used in construction are of excellent quality and TSE certified. The warranty period for civil works is 1 year and for capital structures is 5 years from the date of completion.